Scheme Benefits

What You Get Under PM Surya Ghar Yojana

🏛️
Up to ₹78,000 Direct Subsidy
Government subsidy is a one-time Direct Benefit Transfer (DBT) directly to your registered bank account — not a discount on system price.
💡
300 Units Free per Month
A 3kW system generates ~300 units/month — covering average household consumption. Excess exported to grid earns additional bill credits.
📱
Zero Office Visits Needed
Krishna Solar handles everything online — pmsuryaghar.gov.in registration, PVVNL application, inspection scheduling, and subsidy docs.
Authorized MNRE Installer
Only MNRE-empanelled installers like Krishna Solar can submit PM Yojana applications. Choose a verified installer for smooth processing.
💰
Reduced System Cost
After subsidy, a 3kW system that costs ₹2.40 lakh comes down to ₹1.62 lakh — making solar highly affordable for middle-income families.
🌱
Lifetime Benefits
After the one-time subsidy, the system generates free electricity for 25+ years — lifetime savings of ₹8–15 lakh depending on tariff.
Transparent Pricing

Subsidy Amount Under PM Surya Ghar Yojana

All prices include panels, inverter, mounting, wiring, installation & DISCOM charges. Final quote after free site survey.

CapacityIndicative CostNoteMonthly GenerationBest For
1 kW System₹30,000Central subsidy~100 units/monthStudio / 1 BHK
2 kW System₹60,000Central subsidy~200 units/month2–3 BHK homes
3 kW System₹78,000Maximum subsidy~300 units/month3–4 BHK homes
Above 3 kW₹78,000 capSame as 3kW maxVariesLarge homes / villas
10 kW RWA/GHSpecial ratesGroup housing~1,000 unitsApartment societies

State government of UP may provide additional top-up subsidy. Contact us for latest updated subsidy figures. Call +91-9560773372 for a free site survey & exact quote.

Our Process

How We Get Your PM Surya Ghar Yojana Subsidy

From your first call to a running solar system — typically 10–20 days. We handle everything.

1
Portal Registration
We register you on pmsuryaghar.gov.in using your Aadhaar, electricity consumer number, and PVVNL/DVVNL DISCOM details.
2
Select Authorized Installer
You select Krishna Solar as your empanelled installer on the portal. We then take charge of the entire process.
3
Free Site Survey
Our MNRE-certified engineer visits to assess your rooftop, load, and feasibility — at no cost to you.
4
DISCOM Application
We submit the net metering and technical feasibility application to PVVNL and follow up until approval.
5
Installation in 2–5 Days
Certified team installs solar panels, grid-tie inverter, wiring and net meter with quality-checked materials.
6
DISCOM Inspection
We coordinate the DISCOM inspector visit, get the commissioning certificate, and upload it on the PM Yojana portal.
7
Subsidy in Your Bank
Within 15–30 days of commissioning, the subsidy (up to ₹78,000) is directly credited to your Aadhaar-linked bank account.
FAQ

Common Questions

Get clear answers about costs, installation, warranties and returns before making your decision.

Get Free Quote →
  • PM Surya Ghar Muft Bijli Yojana is the Government of India's flagship rooftop solar scheme launched in February 2024. It provides direct cash subsidies to households installing rooftop solar panels, with the goal of providing 300 units of free electricity per month to 10 million households across India.
  • Under PM Surya Ghar Yojana, you get Rs 30,000 for 1kW, Rs 60,000 for 2kW, and Rs 78,000 (maximum) for 3kW or above solar systems. The subsidy is a one-time Direct Benefit Transfer (DBT) credited directly to your registered bank account within 30 days of DISCOM commissioning.
  • Any Indian household with a PVVNL or DVVNL electricity consumer number, Aadhaar card, and a suitable rooftop can apply. Residential consumers in Gautam Buddh Nagar district including Greater Noida, Noida, Dadri, and Jewar are eligible. Commercial and industrial consumers are not eligible for this central subsidy.
  • Register at pmsuryaghar.gov.in with your Aadhaar, electricity consumer number, and state DISCOM details. After registration, select an empanelled installer like Krishna Solar. We then handle DISCOM application, feasibility check, installation, inspection, and subsidy documentation. Call +91-9560773372 to start the process today.
  • Complete timeline: Registration to DISCOM approval takes 7–15 working days. Installation takes 2–5 days. DISCOM inspection and net meter installation takes 7–15 more working days. Subsidy is credited 15–30 days after commissioning certificate. Total time from application to subsidy in bank: typically 45–60 days.
  • Yes. Krishna Solar is an MNRE-empanelled PM Surya Ghar Yojana authorized installer. We handle portal registration, DISCOM feasibility application, system installation, DISCOM inspection coordination, commissioning certificate, and subsidy documentation — you don't visit any office. Call +91-9560773372.
Start Today — It's Free

Get Your Free Site Survey in Greater Noida

Our MNRE-certified engineer visits, assesses your rooftop & energy load, and gives a detailed proposal — zero cost, zero obligation.

⏱ Response within 2 hours  ·  🚗 Free site visit across Greater Noida  ·  📋 No-obligation quote